Back to News

Westinghouse's eVinci Microreactor

Evinci1

The U.S. Department of Energy (DOE) recently awarded Westinghouse $ $12.9 million in funding to develop the eVinci microreactor using sodium heat pipe technology. Westinghouse aims to design, test, fabricate and install a demonstration reactor by 2022. The company is currently developing an electrical test unit and plans to demonstrate its capabilities by 2020. The advanced heat pipe design will simplify the plant structure and reduce the number of moving parts, creating significant cost and safety benefits. The compact design also requires a small footprint for the installation, opening up new opportunities for location closer to industrial facilities and population centers. Westinghouse is in dialogue with U.S. and Canadian nuclear regulators and aims to license the design for commercial deployment by 2025 after a successful testing phase. This would put Westinghouse at the forefront of the race to commercialize microreactors.

The eVinci microreactor is a high-temperature heat pipe reactor. It consists of a rigid monolithic block with three types of channels that contain fuel, neutron moderators and heat pipes. There are no moving or mechanical parts, except for a radial neutron reflector surrounding the monolithic block that supports the nuclear reaction and allows for completely passive control in the event of power or load loss. eVinci will be delivered as a cogeneration with a power range from 200 kVe to 5 MWe, and the installation time on site will be less than 30 days.


More news

18 September 2026

Bogdan Dimitrov, Deputy CEO of Kozloduy NPP-New Build, took part in the Ninth Summer School on Energy Management„

The project for the construction of Units 7 and 8 at the Kozloduy site is not just a technological investment, but the most powerful driver for macroeconomic growth, competitiveness, and human capital development in Bulgaria. This key thesis united the participants during the Ninth Summer School „Management in Energy“, in which „Kozloduy NPP - New Build“ took an active part [...]

Read more
11 September 2026

„Kozloduy NPP - New Builds is expanding its cooperation with the Polish nuclear industry

The opportunities for deepening industrial cooperation between Bulgaria and Poland in nuclear energy were the focus of a working meeting between the management of Kozloduy NPP - New Build and representatives of leading Polish companies, organised by the Bulgarian Nuclear Industry Association. The Polish enterprises, some of which are already certified and approved as suppliers for global nuclear [...]

Read more
17 July 2026

The management of „Kozloduy NPP – New Builds“ and the US Embassy have confirmed the strategic partnership on the new nuclear power project.

The Board of Directors of „Kozloduy NPP - New Capacities“ held a working meeting with H. Martin McDowell, Chargé d'Affaires of the US Embassy in Sofia, and Mr. Patrick Tilou, Political and Economic Affairs Advisor to the US Embassy. The two sides declared their common commitment to the new nuclear power plant project in Kozloduy, which remains a strategic priority in [...]

Read more
Change the Contrast

Customize this site to your preferences. It's easy, free, and anonymous.