3320 гр.Козлодуй, обл.Враца, ул. "Панайот Хитов" 1А

Notice of Public Hearing on EIAR

‘Kozloduy NPP - New Builds‘ PLC,

Republic of Bulgaria, District of Vratsa, the site of ‘Kozloduy ‘NPP, PO Box 3321

Pursuant to Art. 97, para. 3, in conjunction with Art. 81, para. 1, item 2 of Environmental Protection Act, hereby notify all interested individuals and legal entities that they organize

PUBLIC HEARING MEETINGS

for discussion of the Environmental Impact Assessment Report (EIAR) with all its annexes of the investment proposal:


‘CONSTRUCTION OF A NEW NUCLEAR UNIT OF THE LATEST GENERATION AT THE  ‘KOZLODUY’ NPP SITE
The investment proposal of ‘Kozloduy NPP - New Builds’ PLC envisages design, construction and commissioning of a new nuclear unit of the latest generation (III or III +), a pressurized water reactor (PWR), with an installed power of 1,200 MW, at the site of ‚Kozloduy‘ NPP.

Public discussion meeting will be held on:
14.11.2013 at 13.00 h at the Art Gallery ‘Prof. M. Varbanov‘ Municipality of Oryahovo, Oryahovo, 10 ’A. Chaprazov‘ Street;
15.11.2013 at 13.00 h at the Municipal Club, Municipality of Mizia , Mizia , 4 ‘Petko Bankov‘ Street;
18.11.2013 at 14.00 h at the Municipality of Valchedram, Valchedrum 18-20 ‘Bulgaria‘ Street;
19.11.2013 at 13.00 h at the Municipality of Hayredin, Hayredin, the Ritual Hall;
11.20.2013 at 10.30 at the House of Culture, Municipality of Kozloduy, Kozloduy, 4 ‘Hristo Botev‘ Street.

The EIA report of the project, together with all of its annexes, including the Report on the assessment of the degree of impact are publicly available on the websites of ‘Kozloduy NPP - New Builds‘ PLC - www.npp-nb.bg (see the links below),  ‘NPP Kozloduy’ - www.kznpp.org, and the following locations:

 

  • The building of the Ministry of Environment and Water (MEW), Sofia, 67 ‘William Gladstone‘ Street;
  • The building of the Regional Inspection of Environment and Water (RIEW), Vratsa,  81 ‘Exarch Joseph‘ Street;
  • The building of RIEW Montana 4 ‘Julius IrasekStreet, 3-rd floor;
  • The House of Culture, Kozloduy, 4 ‘Hristo Botev‘ Street;
  • The building of the Municipality of Kozloduy, 13 ‘Hristo Botev‘ Street, Room 104 and the buildings of the mayoralties of the municipality, within the 30-km zone around ‘Kozloduy‘ NPP;
  • The building of the Municipality of Oriahovo, Oriahovo, 15 ‘Andrey Chaprazov‘ Street and the buildings of the mayoralties of the municipality, within the 30-km zone around ‘Kozloduy‘ NPP
  • The building of the Municipality of Mizia , Miziya, 25-27 ‘Georgi Dimitrov ‘ Street and the buildings of the mayoralties of the municipality, within the 30-km zone around ‘Kozloduy‘ NPP
  • The building of the Municipality of Valchedram, Valchedrum,  18-20 ‘Bulgaria‘ Street and the buildings of the mayoralties of the municipality, within the 30-km zone around ‘Kozloduy‘ NPP
  • The building of the Municipality of Hairedin, Hayredin, 135 ‘Georgi Dimitrov’ Street and the buildings of the mayoralties of the municipality, within the 30-km zone around ‘Kozloduy‘ NPP‘
  • The buildings of the mayoralties of the villages of Altimir, Bardarski Geran, Galiche and Tarnava as part from the Municipality of Byala Slatina;
  • The buildings of the mayoralties of the villages of Malorad, Dobrolevo and Sirakovo as part from the Municipality of Borovan;
  • The building of the deputy-mayor of the village of Furen, Municipality of Krivodol;
  • The building of the mayoralty of the village of Lehchevo, Municipality of Boychinovtsi;
  • The building of the deputy-mayor of the village of Stanevo, Municipality of Lom;
  • The building of the deputy-mayor of the village of Beli brod Municipality of Boychinovtsi.

The report on the assessment of the degree of impact – an annex to the EIA Report is also available on the website of the Ministry of Environment and Water at www.moew.government.bg
Statements in writing can be submitted in the buildings of the Municipalities of Oriahovo, Mizia, Valchedram, Hayredin, the Municipality of Kozloduy, as well as in the above listed places where there is access to the EIA report and its annexes, or during the public hearing meetings.
The EIAR together with all its annexes can be downloaded in two zip files from the links below:

  download Part 1 EN,   download Part 2 EN

The contact person on public hearing issues from the contracting authority is: Biliyana Simeonova - expert ecologist, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., tel 0973/7-21-04.

 

тел.: 0973 7 21 04                    факс: 0973 7 24 22                    e-mail: newbuild@npp-nb.bg                    www: www.npp-nb.bg


 

„АЕЦ КОЗЛОДУЙ–НОВИ МОЩНОСТИ“ ЕАД

Република България, област Враца, община Козлодуй, гр. Козлодуй 3321, площадка АЕЦ - Козлодуй

Статут: юридическо лице, еднолично акционерно дружество (ЕАД)
Размер на капитала: 14 000 000,00 лв.

Собственост и органи на управление.
Собственост „АЕЦ Козлодуй“ ЕАД, ЕИК 106513772,

Органи на управление Едноличен собственик на капитала;
Съвет на директорите (СД)

 


 

© 2015   184 atlr.